P24 repaired the damaged cast-iron stormwater system serving the Royal Prince Alfred Hospital roof, working across multiple levels while the hospital remained operational.

Commercial Pipe Relining at Camperdown, Sydney for a commercial site, with the work planned around the access, pipe condition, and repair outcome on site.
The hospital's 225mm cast iron stormwater pipe had sustained significant cracking and breaks throughout its length, spanning multiple hospital levels. The damaged pipe posed a flooding risk to critical areas including the ICU ward, requiring immediate intervention without disrupting hospital operations.
The team relined the damaged sections without excavating through the hospital. The stormwater system was restored while the hospital remained operational and patient areas stayed protected from the work.
Explore other projects from the same category

P24 staged pipe relining across an active Silverwater industrial site so damaged drainage could be restored while operations continued.

P24 relined damaged drainage at Mount Druitt TAFE, staging the work around classes, staff movement, and campus access.
Talk to P24 about site access, operating constraints, CCTV findings, and the repair path that fits the facility without guesswork.